Projects

Azure Boutique Hotel

Full finishing and MEP fit-out of a 64-key coastal boutique hotel.

Sector
Hospitality
Location
El Gouna
Duration
16 months
Delivered
2025

The challenge

A coastal salt environment attacked earlier finishes, and the operator required an identical room standard across 64 keys delivered in three phases.

The solution

We built a full mock-up room approved by the operator, locked material specifications to marine-grade fixings and coatings, and repeated the room as a controlled production line with a fixed inspection checklist per key.

The result

All 64 keys passed operator inspection first time, and the mock-up remains the standard for the group's next property.

From site

Azure Boutique Hotel 1Azure Boutique Hotel 2

Have a similar project?

Send the scope and we return a structured proposal with a priced bill of quantities.