Projects
Orbit Retail Galleria
Retail galleria with smart lighting, BMS and tenant fit-out coordination.
- Sector
- Commercial
- Location
- Sheikh Zayed
- Duration
- 18 months
- Delivered
- 2026
The challenge
Thirty tenants with independent fit-out contractors needed simultaneous access without compromising the base-build commissioning.
The solution
We issued a tenant fit-out manual with metered service take-off points, ran a permit-to-work desk on site, and commissioned base-build systems zone by zone ahead of tenant handovers.
The result
Opened at 92% tenant readiness with no base-build system re-commissioning.
From site


Solutions applied
Products supplied
Related projects
Have a similar project?
Send the scope and we return a structured proposal with a priced bill of quantities.