Overview
Independent technical assessment: defect diagnosis, material testing, energy audits, and written expert reports usable for insurance, litigation or purchase decisions.
- Defect diagnosis
- Material testing
- Thermal imaging
- Energy audit
- Pre-purchase inspection
- Expert witness reports
Benefits
- Written, stamped expert reports
- Non-destructive testing capability
- Pre-purchase property inspection
- Energy and consumption audits
Why choose us
Contractor-grade buildability advice, not theory
Independent cost benchmarking
Code and authority compliance from day one
Deliverables you can tender directly
Technical specifications
- Deliverables
- Reports, drawings, BOQ, tender documents
- Turnaround
- From 5 working days
- Software
- AutoCAD, Revit, SAP2000, Primavera
- Compliance
- Local authority and civil defence review
Typical timeline
- 1Days 1-3 — brief and site data
- 2Week 1 — technical study
- 3Week 2 — costed recommendation
- 4Weeks 3-4 — documentation and tender support
Execution process
- 01
Brief & discovery
Objectives, constraints, budget and programme.
- 02
Technical study
Site data, code review and option analysis.
- 03
Recommendation
Costed recommendation with risk register.
- 04
Documentation
Drawings, specifications and tender documents.
- 05
Supervision
Site supervision and compliance reporting.
Frequently asked
How quickly can you inspect?
Site visit usually within 48 hours; report within five working days.
Are your reports court-admissible?
Yes, issued and stamped by a registered engineer.
Related solutions
Civil & Structural Works
Excavation, concrete, steel structures, masonry, waterproofing and infrastructure.
Learn moreMEP Systems
Electrical, plumbing, HVAC, fire fighting and fire alarm — designed, installed, commissioned.
Learn moreELV & Smart Systems
CCTV, access control, structured cabling, BMS and full smart-home integration.
Learn moreClient feedback
“Their value engineering saved 11% without touching quality.”
Request a quote for Technical Consultancy
Send the scope and we return a structured proposal with a priced bill of quantities.
