Solutions

Renovation

Full renovation of occupied and vacant properties.

Overview

A condition survey first, then a phased plan that keeps the property usable where possible — with dust control, protected access routes and firm reinstatement dates.

  • Strip-out & demolition
  • Structural modifications
  • MEP replacement
  • Full refinishing
  • Facade renovation
  • Compliance upgrades

Benefits

  • Condition survey before pricing
  • Phased works to keep areas usable
  • Dust and noise control plan
  • Existing services traced before demolition

Why choose us

01

Mock-up approved before bulk execution

02

Materials sourced through our own supply centre

03

Tolerances measured, not estimated

04

Zero-snag handover protocol

Technical specifications

Tolerances
±2 mm over 2 m straight edge
Materials
Client-approved samples, batch-matched
Substrate
Moisture tested before installation
Warranty
24 months on workmanship

Typical timeline

  1. 1Week 1 — samples and mock-up
  2. 2Week 2 — shop drawings and approvals
  3. 3Weeks 3-9 — installation
  4. 4Week 10 — snagging and handover

Execution process

  1. 01

    Design & samples

    Material boards, mock-ups and client approval.

  2. 02

    Shop drawings

    Setting-out drawings for every visible line and joint.

  3. 03

    Substrate preparation

    Levelling, moisture control and priming.

  4. 04

    Installation

    Skilled finishing crews working to the approved mock-up.

  5. 05

    Protection & handover

    Protection, cleaning, snagging and defect closure.

Frequently asked

Can we stay in the property?

Often yes, with phased zones and sealed work areas.

Can walls be removed?

Only after a structural assessment; we design and install any needed support.

Client feedback

The mock-up matched the final result exactly — that never happens.
S. AdelVilla Owner

Request a quote for Renovation

Send the scope and we return a structured proposal with a priced bill of quantities.