Overview
A planned programme built from your asset register: the right task, at the right interval, logged against each asset with a monthly report on cost and uptime.
- HVAC servicing
- Electrical inspection
- Plumbing checks
- Fire system testing
- Generator servicing
- Building fabric
Benefits
- Asset register with condition rating
- Planned task calendar per asset
- Fewer emergency callouts and lower cost
- Monthly uptime and spend report
Why choose us
Guaranteed response times written into the SLA
CMMS-tracked asset history you can audit
In-house multi-discipline technicians
Transparent spare-part pricing
Technical specifications
- Response time
- Emergency 2h / urgent 8h / routine 48h
- Coverage
- Up to 24/7 depending on contract tier
- System
- CMMS asset history and ticketing
- Reporting
- Monthly KPI and cost report
Typical timeline
- 1Week 1 — asset survey
- 2Week 2 — SLA and plan sign-off
- 3Week 3 — mobilisation
- 4Ongoing — planned visits and monthly reporting
Execution process
- 01
Asset survey
Full asset register with condition rating.
- 02
Plan & SLA
Scheduled tasks, response times and escalation matrix.
- 03
Mobilisation
Team, spares and CMMS set up on site.
- 04
Delivery
Planned and reactive works logged against every asset.
- 05
Reporting
Monthly KPI report with cost and uptime analysis.
Frequently asked
What is the minimum contract?
Twelve months, with quarterly review points.
Are spares included?
Consumables are included; major spares are quoted at transparent list pricing.
Related solutions
Civil & Structural Works
Excavation, concrete, steel structures, masonry, waterproofing and infrastructure.
Learn moreMEP Systems
Electrical, plumbing, HVAC, fire fighting and fire alarm — designed, installed, commissioned.
Learn moreELV & Smart Systems
CCTV, access control, structured cabling, BMS and full smart-home integration.
Learn moreClient feedback
“Response times are met and the monthly report is genuinely readable.”
Request a quote for Preventive Maintenance
Send the scope and we return a structured proposal with a priced bill of quantities.
