Overview
Straight, plumb walls set out from shop drawings, with lintels, ties and openings coordinated with MEP before a single block is laid.
- Block & brick walls
- Lightweight partitions
- Lintels & ties
- Internal plaster
- External render
- Acoustic walls
Benefits
- Openings coordinated with MEP first fix
- Verticality checked line by line
- Thermal and acoustic block options
- Plaster tolerance ±2 mm over 2 m
Why choose us
Own plant, formwork and labour — no subcontract chain
Third-party lab testing on every structural element
Method statements approved before mobilisation
Programme-linked payment and weekly progress reporting
Technical specifications
- Design codes
- ECP 203 / ACI 318
- Concrete grades
- C25 – C60, tested per pour
- Reinforcement
- B500B certified, mill-certified batches
- QA/QC
- Independent lab, ITP hold points
Typical timeline
- 1Week 1 — survey, soil review, mobilisation
- 2Weeks 2-4 — enabling works and foundations
- 3Weeks 5-14 — main execution
- 4Week 15 — testing and structural handover
Execution process
- 01
Survey & setting out
Topographic survey, soil review and benchmark setting.
- 02
Method statement
Approved method statement, ITP and safety plan.
- 03
Execution
Own crews and plant working to the approved sequence.
- 04
Testing & inspection
Independent lab testing and consultant inspection at each hold point.
- 05
Handover
As-built drawings, test records and snag closure.
Frequently asked
Which block type do you recommend?
AAC for thermal performance and speed, solid concrete block for wet and loaded areas.
Do you guarantee against plaster cracks?
Yes, with mesh at joints and a 24-month workmanship warranty.
Related solutions
Civil & Structural Works
Excavation, concrete, steel structures, masonry, waterproofing and infrastructure.
Learn moreMEP Systems
Electrical, plumbing, HVAC, fire fighting and fire alarm — designed, installed, commissioned.
Learn moreELV & Smart Systems
CCTV, access control, structured cabling, BMS and full smart-home integration.
Learn moreClient feedback
“The structure was delivered two weeks early with every cube test on file.”
Request a quote for Masonry
Send the scope and we return a structured proposal with a priced bill of quantities.
